Monday, April 23, 2007

Construction Continues

There's been a lot of activity since the last posting. Much of the interior shelving and flooring is done. About half of the bridgedeck floor is in place.

I'm currently building the piece that curves up from the bridgedeck to meet the sheerline. The webs are framed in 19x19 timber, which needs to be bent to a radius of 1500mm. Here's the makeshift steamer I made to help bend the timber. It did the job very well

Posted by Tony at 7:30 AM